Laserfiche WebLink
Final Opinion of Probable Cost <br />Consultant shall provide updated opinion of probable construction cost which shall reflect finalized plans, <br />materials, systems, details of construction, and known or anticipated changes in the bidding market <br />relative to the project, Should project scope exceed available budget, project plans/speclflcatlons will be <br />phased as appropriate. <br />Plan Check & Permits; Plan process with Governmental agencies having jurisdiction over the project by <br />City Staff per RFP. <br />Construction drawings shall be submitted at 90% completion for constructabllity review by Public Works <br />Engineering Divlslon, and revised as directed, The 100% complete construction drawing package will then <br />be submitted for final City review and relevant Agencies, ConsVuctlon drawings shall be In accordance <br />with the 2013 California Building Code and the Americans with Disabilities Act and will also require <br />ravlew/approval by the City Planning and Building Agency, As a condition of plan check approval, plans <br />and specifications will be signed by a California licensed architect / landscape architect / civil engineer, <br />Task M Bid Advertisement, Construction Administration, Record Drawings; <br />Bid Advertisement <br />Consultant shall provide support to the City during the Bidding phase by assisting with questions, requests <br />for Information/clarification, or conflicts arising out of the bidding process. Consultant shall also attend <br />pre-bid meeting, If scheduled. <br />Construction Administration <br />Consultant shall provide support to the City during the Construction Administration phase by assisting <br />with questions, requests for Information/clarification, and/or reviewing submittals. <br />Record Drawings/ As-bullt Plans; <br />Upon construction completion, consultant shall Incorporate as -built Information, as provided by the <br />General Contractor, Into the drawing files to provide record drawings for City archives, <br />B. Compensation <br />MS+MEGT Collaborative <br />Task Pre -Design <br />Task II Design Development <br />Task III Construction Documents <br />Task IV Bid Advertisement, Construction <br />Administration, Record Drawings <br />SubTotal <br />Civil Engineer <br />Geotechnical Engineer <br />MEP Engineer <br />SubTotal <br />Total <br />Page 8 of 4 <br />25R-21 <br />$ 8,610 <br />$12,900 <br />$13,500 <br />$ 3,930 <br />$38,940 <br />$19,000 <br />$ 8,615 <br />$ 6,000 <br />$ 33,615 <br />$7,2,555 <br />