My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-077 - Approving an Addendum to the Final Environmental Imapact
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-077 - Approving an Addendum to the Final Environmental Imapact
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 2:34:15 PM
Creation date
12/18/2017 4:15:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-077
Date
12/5/2017
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements -Project No. 17-6883 <br />MODIFIED INITIAL STUDY CHECKLIST <br />Final I December 2017 4 Appendix A -Mod ified Initial Study Checklist <br />New Impacts ofProposed <br />Premous FEISIEIR <br />Project Changes <br />No <br />Less Than <br />Less Than <br />Potentially <br />Impacts <br />Subsequent or <br />Impact <br />Significant <br />Significant <br />Significant <br />Disclosed? <br />Supplemental EIR <br />Impact <br />After 1990 <br />Impact <br />Required? <br />Mitigabon <br />f) Conflict with the provisions of an adopted <br />Habitat Conservation Plan, Natural <br />Community Conservation Plan, or other <br />X <br />YES <br />NO <br />approved local, regional, or state habitat <br />conservation plan? <br />5. CULTURAL RESOURCES. Would the <br />project: <br />a) Cause a substantial adverse change in <br />the significance of a historical resource as <br />X <br />YES <br />NO <br />defined in § 15064.5? <br />b) Cause a substantial adverse change in <br />the significance of an archaeological <br />X <br />YES <br />NO <br />resource pursuant to § 15064.5? <br />c) Directly or indirectly destroy a unique <br />paleontological resource or site or unique <br />X <br />YES <br />NO <br />geologic feature? <br />d) Disturb any human remains, including <br />those interred outside of formal <br />X <br />YES <br />NO <br />cemeteries? <br />6. GEOLOGY AND SOILS. Would the <br />project: <br />a) Expose people or structures to potential <br />substantial adverse effects, including the <br />risk of loss, injury, or death involving: <br />i) Rupture of a known earthquake fault, as <br />delineated on the most recent Alquist- <br />Priolo Earthquake Fault Zoning Map <br />issued by the State Geologist for the area <br />X <br />YES <br />NO <br />or based on other substantial evidence of a <br />known fault? Refer to Division of Mines <br />and Geology Special Publication 42. <br />ii) Strong seismic ground shaking? <br />.. <br />X <br />................ <br />............. <br />YES <br />NO <br />iii) Seismic -related ground failure, including <br />X <br />YES <br />NO <br />liquefaction? <br />iv) Landslides? <br />X <br />.. <br />....... <br />_____ <br />......... <br />YES <br />NO <br />.... <br />b) Result in substantial soil erosion or the <br />X <br />YES <br />NO <br />loss Oftopsoil? <br />Final I December 2017 4 Appendix A -Mod ified Initial Study Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.