Laserfiche WebLink
ENVIRONMENTAL IMPACT REPORT ADDENDUM <br />Bristol Street and Memory Lane Intersection Improvements -Project No. 17-6883 <br />MODIFIED INITIAL STUDY CHECKLIST <br />Final I December 2017 5 Appendix A -Mod ified Initial Study Checklist <br />New Impacts ofProposed <br />Premous FEISIEIR <br />Project Changes <br />No <br />Less Than <br />Less Than <br />Potentially <br />Impacts <br />Subsequent or <br />Impact <br />Significant <br />Significant <br />Significant <br />Disclosed? <br />Supplemental EIR <br />Impact <br />After 1990 <br />Impact <br />Required? <br />Mitigabon <br />c) Be located on a geologic unit or soil that <br />is unstable, or that would become unstable <br />as a result of the project, and potentially <br />X <br />YES <br />NO <br />result in on- or off-site landslide, lateral <br />spreading, subsidence, liquefaction or <br />collapse? <br />d) Be located on expansive soil, as defined <br />in Table 18-1-B ofthe Uniform Building <br />X <br />YES <br />NO <br />Code (1994), creating substantial risks to <br />life or property? <br />e) Have soils incapable of adequately <br />supporting the use of septic tanks or <br />alternative waste water disposal systems <br />X <br />YES <br />NO <br />where sewers are not available for the <br />disposal of waste water? <br />7. GREENHOUSE GAS EMISSIONS. <br />Would the project: <br />a) Generate greenhouse gas emissions, <br />either directly or indirectly, that may have a <br />X <br />YES <br />NO <br />significant impact on the environment? <br />b) Conflict with an applicable plan, policy <br />or regulation adopted for the purpose of <br />X <br />YES <br />NO <br />reducing the emissions of greenhouse <br />gases? <br />8. HAZARDS. Would the project involve: <br />a) Create a significant hazard to the public <br />or the environment through the routine <br />X <br />YES <br />NO <br />transport, use, or disposal of hazardous <br />materials? <br />b) Create a significant hazard to the public <br />or the environment through reasonably <br />foreseeable upset and accident conditions <br />X <br />YES <br />NO <br />involving the release of hazardous <br />materials into the environment? <br />.. <br />................. <br />......... <br />.... <br />c) Emit hazardous emissions or handle <br />hazardous or acutely hazardous materials, <br />X <br />YES <br />NO <br />substances, or waste within one-quarter <br />mile of an existing or proposed school? <br />d) Be located on a site which is included <br />on a list of hazardous materials sites <br />compiled pursuant to Government Code <br />X <br />YES <br />NO <br />Section 65962.5 and, as a result, would it <br />create a significant hazard to the public or <br />the environment? <br />Final I December 2017 5 Appendix A -Mod ified Initial Study Checklist <br />