My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS INC - 2017
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS INC - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:04:49 PM
Creation date
12/28/2017 10:00:15 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS INC
Contract #
A-2017-338
Agency
PUBLIC WORKS
Council Approval Date
12/5/2017
Expiration Date
12/4/2020
Insurance Exp Date
4/1/2019
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
outline any action taken by the Consultant in resolving the comment, This spreadsheet will be <br />submitted to all reviewers as part of the 100% PS&E submittal. If needed, the Consultant shall <br />schedule review meetings with key reviewers to clarify any comments and resolve any conflicting <br />comments, <br />All comments from the 60% review must be addressed and incorporated into the 100% PS&E's as <br />stated in the response matrix. The 100% PS&E submittal shall include a complete set of <br />improvement plans including all disciplines and all detail sheets. The 100% Specifications/Bid <br />Documents shall be a complete package with all bid items included, The 100% engineer's estimate <br />of probable costs shall be. complete including updated quantities, unit prices, and carried totals for <br />each bid item and a grand total for the Project. Two (2) hard copies of fall size (36x24) plan sets, <br />four (4) hard copies of half size (l 1x17) plan sets, one (1) electronic pdf copy of the 100% PS&E's <br />shall be delivered to the Project Manager. Design files, e,g., digital terrain model and alignment <br />files in InRoads may be submitted to expedite the review process, <br />Task 10. Final Construction Document (PS&E) Submittal <br />After receiving any comments on the 100% submittal from the various reviewers, the Consultant <br />shall prepare Final PS&E's ready for bidding. The Consultant shall be required to compile in a <br />matrix format 0 100% comments received and responses by the Consultant for review by the <br />Project Manager. A column in the matrix will outline any action taken by the Consultant in <br />resolving the comment. This spreadsheet will be submitted to all reviewers prior to and, as part of <br />the Final PS&E submittal. If needed, the Consultant shall schedule review meetings with key <br />reviewers to clarify any comments and resolve any conflicting comments. <br />All comments from the 100% review will be addressed and where required will be incorporated <br />into the Final PS&E's. The Final PS&E submittal shall include a complete set of improvement <br />plans including all disciplines, all detail sheets and shall be signed by a registered engineer in the <br />State of California for each discipline, The Final Specifications/Bid Documents submittal shall be <br />a complete package with all sections of the standard City bid documents included and will have <br />listed all bid items in the standard form, The Final Engineer's estimate of Probable Costs shall be <br />complete including final quantities, unit prices, carried totals for each bid item, a grand total for <br />the Project, Two (2) hard copies of full size (36x24) plan sets, four (4) hard copies of half size <br />(11x17) plan sets, one (1) electronic copy of the final PS&E's shall be delivered to the Project <br />Manager. <br />The Consultant shall be responsible for addressing any final comments to the plans, specifications <br />and engineer's estimate of probable costs based on input from the Project Manager prior to going <br />to bid. <br />Task 11. Bidding Phase Services <br />Throughout the bidding and, construction process, the Consultant shall be required to assist the <br />Project Manager in the following items: <br />a. Assist in responding to questions raised during the bidding process including preparation <br />of any addenda, <br />b. Attend the pre -construction meeting and construction ldrk-off meeting. <br />"Task 12. Construction Phase Services <br />City of Santa Ana RFP 16-110 <br />Page Al -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.