Laserfiche WebLink
Pinal Opinion of Probable Cast <br />Consultant shall provide updated opinion of pro bob Ia construction cost which shall reflect fInallzad plans, <br />materials, systems, details of con strilmlon, and known or antlelpated changes In the bidding market <br />relative to the project. Should project scope exceed available budget, project plans/specifications will be <br />phased as appropriate. <br />Plan Check ✓i< Permits; Plan process with Governmental agencies having jurlsdictlon over the project by <br />Ctty staff per R M <br />Construction drawings shall be submitted at 90%completion for constructabllity review by Public Works <br />Engineering Divislon, and revised as directed, The, 10OV complete construction drawing package will then <br />be submitted for final City review and relevant Agencies. Construction drawings shall be In accordance <br />with the 2013 California Building Code and the Americans with Disabilities Act and will also require <br />revlow/approval by the City Planning and Building Agency, Asa condition of plan chock approval, plans <br />and specifications will be signed by a California licensed orchlteot / landscape architect / civil engineer, <br />Task IVt Bid Advertisement, Construction Administration, Record Drawings: <br />Bid Advertisement <br />Consultant shall provide support to the City during the Bidding phase by assisting with questions, requests <br />for Information/clarification, or conflicts arising out of the bidding process, Consultant shall also attend <br />pre -bid meeting, If scheduled. <br />Construction Administration <br />Consultant shall provide support to the City during the Construction Administration phase by assisting <br />with questions, requests for Information/clarification, and/or reviewing submittals. <br />Record Drawings / As -built Me= <br />Upon construction completion, consultant shall incorporate as-Isullt Information, as provided by the <br />General Contractor, Into the drawing files to provide record drawings far City archives. <br />B. Compensation <br />MS+MEGT Collaborative <br />Task Pre -Design <br />Task II Design Development <br />Task IIi Construction Documents <br />Task IV Bid Advertisement, Construction <br />Administration, Record Drawings <br />SuMtal <br />Civil Engineer <br />Geotechr*al Engineer <br />MEP Engineer <br />SubTotal <br />Total <br />Page 3 of 4 <br />$ 8,610 <br />$12,900 <br />$ 13,500 <br />$ 3,930 <br />$38,940 <br />$1fl,000 <br />$ 3,615 <br />$ 6,000 <br />$ 33,615 <br />$72,555 <br />