Laserfiche WebLink
ENTERPRISE Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />AUTOMATION xrovw. ea Tel 9-6000 Fax 9497696008 <br />.eaintinteprator.wm <br />7.4 Control panel design <br />Enterprise Automation will develop complete control panel designs for the <br />following sites: <br />1. Crooke Pump Station <br />2. Cambridge Pump Station <br />3. System Pressure Reducing Valve Stations (4 total) <br />The designs will be processed for accuracy via a four step process: <br />1. Develop a panel design <br />2. Draft and review the panel drawings <br />3. Submit the panel drawings for City review <br />4. Incorporate the City's comments into the final panel design <br />The PLC panel hardware specifications developed for the Walnut Pump Station <br />project will be used as the basis for panel component selection. <br />The panel design will also draw heavily on the reuse of the San Lorenzo Lift <br />Station panel design and existing EA standards, to minimize project expense and <br />lead time. <br />An important consideration with this approach (ie. to leverage existing work), is <br />that although EA is currently contracted to -deliver a panel design for the San <br />Lorenzo Lift Station, this task will not be performed until the San Lorenzo project <br />reaches the construction phase. In the event that panel design for this scope of <br />work is initiated prior to the San Lorenzo design, it may be necessary to adjust the <br />Fee Proposal to compensate for the additional design work required. <br />7.4.1 Drawings and documentation <br />Enterprise Automation will determine the I/O requirements of the PLC panel, and <br />will develop AutoCAD drawings and documents which will include: <br />1. Front Panel Layout Drawing <br />2. Back Panel Layout Drawing <br />3. Power Distribution Drawing <br />4. Communication Network Drawing <br />5. Analog Inputs/Outputs Drawing <br />6. Digital Inputs/Outputs Drawing <br />7. Wire numbering <br />8. Symbol legend <br />9. Construction notes and fabrication standards <br />Client: City of Santa Ana Revision: 1.0.0 <br />Document: Response to RFP 17-112 Date:- 11/21/2017 <br />Section: Scope of Services & Schedule Page Number 14 of 01 <br />25E-26 <br />