My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
25E - AGMT WATER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:02:51 PM
Creation date
2/1/2018 7:10:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />10. Panel and terminal labels <br />11. Bill of materials <br />12.1/0 List with Tag Names <br />13. Design calculations: <br />a. Heat dissipation <br />b. Power supply and battery calculations <br />c. Wire duct fill <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-769-6000 Fax 949-769-6005 <br />�.eaintearator.com <br />14. Specifications for: <br />a. DC Power Components (standard provided by City) <br />b. Ethernet and Networking Components (standard provided by City) <br />c. Telemetry Components (standard provided by City) <br />d. Control Panel Construction (standard provided by City) <br />Key Deliverables <br />• Client Requested: <br />a) 1/0 list <br />b) Complete set of drawings <br />c) Complete set of associated specifications <br />7.5 Functional specifications <br />EA will develop functional specifications as required by the RFP for the following <br />sites: <br />1. Crooke Pump Station <br />2. Cambridge Pump Station <br />3. System Pressure Reducing Valve Stations (4 total) <br />The functional specifications will substantially conform to the standard functional <br />specification format developed by EA for the EAST Pump Station, SA -5 vault, San <br />Lorenzo Lift Station, and the Walnut Pump Station projects. <br />The development process will be split into two phases, which consist of the <br />following tasks: (notes in parentheses are the terms used in theRFP) <br />1. Functional Specification Preparation: <br />a. Site surveys <br />It. Existing Site Condition Technical Memorandum <br />c. Existing site condition workshop (existing condition work sessions) <br />d. Functional specification workshop (operations workshop) <br />Client: Cib/-of Santa Ana Revision: 1,0.0 <br />Document: Response to RFP 17-112 Date: 11/2112017 <br />Section__ Scope of Services & Schedule Pa a Number 15 of 31 <br />25E-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.