Laserfiche WebLink
ENTERPRISE <br />AUTOMATION <br />2. Functional Specification Development: <br />a. Functional specification production <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-789-80017 Fax 949_-769-8005 <br />�.eaintegrator.com <br />b. Functional specification review workshop <br />7..5.1 Preparation <br />The purpose of this phase is to develop a strong understanding of the existing site. <br />EA will leverage this information to provide recommendations for hardware, <br />controls, standardization, and operation upgrades, which will be incorporated into <br />the panel design and functional specifications. <br />7.5.1.1 Site surveys <br />EA will inspect and document the condition of the controls at the existing facilities <br />and catalog the existing controls hardware. Per the RFP, an allowance of one S <br />hour day for 2 EA engineers has been provided for each site. We believe that 2 <br />engineers are necessary in order to capture all the information needed and to <br />reduce the risk that something is overlooked or forgotten. <br />The RFP requires that the integrator catalogue all existing controls and <br />equipment. It will. also be necessary to collect several key documents related to the <br />site including: <br />1. Cut sheets <br />2. Equipment manuals <br />3. Panel designs <br />4. Electrical plans <br />5'. Construction plans <br />6. MIDs <br />7. Operations documentation <br />EA anticipates that collecting these documents (which should they exist, may -or <br />may not actually be located at the site) will take additional effort that is not <br />included in the City's site visit allowance. [MB additional effort ie notinc/udedin <br />the Fee FmpoaW <br />Client: City of Sante Ana Revision: 1.0.0 <br />Document Response to RFP 17-112 Date:. 1112112017 <br />Section: Scope or Services&Schedule Page Number 16 of 31 <br />25E-28 <br />