My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
25E - AGMT WATER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:02:51 PM
Creation date
2/1/2018 7:10:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />2. Functional Specification Development: <br />a. Functional specification production <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-789-80017 Fax 949_-769-8005 <br />�.eaintegrator.com <br />b. Functional specification review workshop <br />7..5.1 Preparation <br />The purpose of this phase is to develop a strong understanding of the existing site. <br />EA will leverage this information to provide recommendations for hardware, <br />controls, standardization, and operation upgrades, which will be incorporated into <br />the panel design and functional specifications. <br />7.5.1.1 Site surveys <br />EA will inspect and document the condition of the controls at the existing facilities <br />and catalog the existing controls hardware. Per the RFP, an allowance of one S <br />hour day for 2 EA engineers has been provided for each site. We believe that 2 <br />engineers are necessary in order to capture all the information needed and to <br />reduce the risk that something is overlooked or forgotten. <br />The RFP requires that the integrator catalogue all existing controls and <br />equipment. It will. also be necessary to collect several key documents related to the <br />site including: <br />1. Cut sheets <br />2. Equipment manuals <br />3. Panel designs <br />4. Electrical plans <br />5'. Construction plans <br />6. MIDs <br />7. Operations documentation <br />EA anticipates that collecting these documents (which should they exist, may -or <br />may not actually be located at the site) will take additional effort that is not <br />included in the City's site visit allowance. [MB additional effort ie notinc/udedin <br />the Fee FmpoaW <br />Client: City of Sante Ana Revision: 1.0.0 <br />Document Response to RFP 17-112 Date:. 1112112017 <br />Section: Scope or Services&Schedule Page Number 16 of 31 <br />25E-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.