My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
25E - AGMT WATER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:02:51 PM
Creation date
2/1/2018 7:10:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE Enterprise Automation <br />A <br />210 Goddard Irvine CA 92618 USA <br />A UTOMATIOn <br />Tel .eaint araoo Fax 9497696005 <br />www.eaintearator. com <br />8 Other Value Added Related Services <br />Following are a number of related services that EA could provide the City in the <br />immediate or long term future. They have not been embedded in the, main body of <br />the scope of work as they are either slightly tangential to the purpose of the RFP <br />or are significant undertakings. Nevertheless, EA believes that the City could <br />benefit greatly from implementing these ideas (assuming of course that the .City is <br />not already performing some of these activities). These ideas are in no particular <br />order. <br />8.1 Dynac, network, and telemetry change management <br />The RFP is primarily focused on field assets -such as PLC's and OIT6. However, the <br />water resources system should be treated as a single managed asset that includes <br />Dynac, networking (switches; security appliances, etc.), servers, and telemetry <br />systems. These additional assets should be managed no differently from the field <br />assets which would include: <br />1. <br />Source. control <br />2. <br />Change control <br />3. <br />Specifications <br />4. <br />Test documentation <br />5. <br />Internal testing_. <br />6. <br />FAT <br />7. <br />SAT <br />8.2 SCADA cyber security <br />Perform periodic independent reviews of cyber security vulnerabilities and upkeep <br />with industry best practices. <br />8.3 SCADA maintenance <br />Schedule formal periodic maintenance of the Dynac SCADA system,. including <br />Microsoft security patches, operating system health checks, and verification that <br />server failover continues to produce the expected results. <br />Client: City of Santa Ana Revision: 1,0.0 <br />Document: ResponsetoRFP 17-112 Dater 11121/2017 <br />Sectiom Scope of Services & Schedule _ Page Number 25 of 31 <br />25E-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.