My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH ELECTRIC VEHICLE FEE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
75A - PH ELECTRIC VEHICLE FEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:04:35 PM
Creation date
2/1/2018 7:10:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
75A
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LTA IC <br />Project p:73-727.4. <br />EV Charging Unit/Station Orders: <br />• Two (2) ChargePoint dual -port, bollard -mounted Gateway charging units. (CT4021-GW1) <br />• Two (2) ChargePoint dual -port, bollard -mounted Gateway charging units. (CT4021) <br />• Four (4) ChargePoint Concrete Mounting Kits. (CT4001-CCM) <br />• Four (4) ChargePoint Power Management Kits. (CT4000-PMGMT) <br />• One (1) Year Pre -Paid Commercial Network Service Plan (per port): designed for employers, businesses <br />and the government. The service plan support is directly through ChargePoint, Inc and includes 24/7/365 <br />driver support, access control, general reporting, OTA upgrades, payment processing, flexible pricing <br />policies, reservations and more. (CPCLD-COMMERCIAL=1) <br />• Initial Station Activation & Configuration Service includes activation of cloud services and configuration of <br />radio groups, custom groups, connections, access control, visibility control, pricing, reports and alerts. <br />One-time initial seryice per station. (CPSUPPORT-ACTIVE) <br />• One (1) year of CT4000 Assure coverage included in the purchase per unit. (&4000 -ASSURE) <br />• Additional four (4) year package of CT4000 Assure coverage included (Billed Yearly). This package <br />includes 50% discount on $349.00 cost of Activation per unit. (CT4000-ASSURE4-COMMIT) <br />• Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. <br />(CPSUPPORT-SITEVALI D) <br />CHARGING UNIT BREAKDOWN <br />Eauloment (CT40001 <br />Unit Price <br />Quantity <br />Total <br />Gateway <br />$280.00 <br />8 <br />$2,240.00 <br />CT4D21-GW1 <br />$7,210.00 <br />2 <br />$14,420.00 <br />WD Discount <br />20% <br />2 <br />-$2,884.00 <br />Non -Gateway <br />$3,b28.00 <br />4 <br />Paid Annually <br />CT4021 <br />$6,695.00 <br />2 <br />$13,390.00 <br />WD Discount <br />20% <br />2 <br />-$2,678.00 <br />Miscellaneous <br />CT4001-CCM <br />$95.00 <br />4 <br />$380.00 <br />CT4000-PMGMT <br />$50.00 <br />4 <br />"$200.00 <br />Product Services (CT4000 <br />CPSUPPORT-SITEVALID <br />$C(� <br />1 <br />$0.00 <br />CPCLD-COMMERICAL-1 <br />$280.00 <br />8 <br />$2,240.00 <br />CPSUPPORT-ACTIVE <br />$349.00 <br />4 <br />$700.00 <br />CT4000-ASSURE <br />$0.00 <br />4 <br />$0.00 <br />CT4000-ASSURE4-COMMIT <br />$3,b28.00 <br />4 <br />Paid Annually <br />over 4,yrs. <br />Tax & S/H: $2,961.00 <br />EVCS Unit(s) & Servlce(s) Total Price: $28,729.00 <br />-11- <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print Date: January 17, 2018 <br />75A-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.