Laserfiche WebLink
RESOLUTION OF INTENTION NO. <br /> <br />ASSESSMENT DISTRICT NO. 233 <br />SANTA ANA, CALIFORNIA <br /> <br /> The City Council of the City of Santa Arm, California, <br />in regular session assembled, does hereby resolve and determine <br />as follows: <br /> <br /> SECTION 1: That it is the intention of said City Council, <br />after acquiring jurisdiction so to do pursuant to the provisions of <br />.Article XIII, Section 17 of the Constitution, and Division 4 of the <br />Streets and Highways Code of the State of California, and Sections <br />7230 to 7233, inclusive, of the Santa Aha Municipal Code, to order <br />the following work to be done or improvements to be made in said <br />City of Santa Aha, California, to wit: <br /> <br /> The construction and installation of concrete curb and <br />gutter, concrete sidewalk, concrete cross gutter, concrete drive- <br />way approaches, asphalt concrete pavement over aggregate base <br />material, roadway excavation, the removal of existing concrete <br />sidewalk and driveway approaches in the line of said work, the <br />adjustment of three existing manholes to grade, together with appur- <br />tenances and appurtenant work, in Camille Street from a point there- <br />in 46 feet East of its intersection with the center line of Harbor <br />Boulevard to a point in its intersection with Jackson Street 1302 <br />feet East of said center line of Harbor Boulevard, and in the <br />Westerly one-half of Jackson Street for a distance of 42 feet <br />North of the center line of Camille Street, with the existing curb <br />and gutter to remain in place in Camille Street as shown upon the <br />plans for said work: <br /> <br />on the Northerly side to Station 1+26; and <br />on the Southerly side to Station 2+03.7; and <br /> <br />with existing concrete curb and gutter, and sidewalk, to remain in <br />place in the Southerly one-half of Camille Street as shown on said <br />plans from Stations 8+10.10 to 8+69.8 and 11+10.2 to Jackson Street; <br />and with existing pavement to remain in place in the Southerly one- <br />half of Camille Street as shown on said plans: <br /> <br />from Stations &~~10.10 to 8+69.8, and 11+02 to <br />12+28.50, but excepting the Northerly 11 feet <br />thereof; and <br />from Station 12+28.50 to Jackson Street. <br /> <br /> The construction and installation of concrete curb and <br />gutter, concrete sidewalk, concrete driveway approaches, asphalt <br />concrete pavement over aggregate base material, the removal of <br />existing concrete sidewalk and driveway approaches, and pavement, <br />and roadway in the line of said work, together with appurtenances <br />and appurtenant work, in the Southerly one-half of Fourteenth <br />Street from a point therein 30 feet East of its intersection with <br />the center line of French Street to a point in its intersection <br />with Poinsettia Street 594.38 feet East of said center line of <br />French Street, and in the Westerly one-half of Poinsettia Street <br />from its intersection with Fourteenth Street to a point in <br />Poinsettia Street 50 feet South of the center line of Fourteenth <br />Street, with the existing concrete curb and gutter and concrete <br />sidewalk to remain in place in Fourteenth Street from Stations <br />0+30 to 2+40, as shown upon the aforesaid plans, and with the <br />existing pavement to remain in place generally in the Northerly <br />one-half of said Southerly one-half of Fourteenth Street. <br /> <br />-1- <br /> <br /> <br />