My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
90-113
Clerk
>
Resolutions
>
CITY COUNCIL
>
1952 - 1999
>
1990
>
90-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2015 1:52:56 PM
Creation date
6/26/2003 10:46:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
90-113
Date
12/17/1990
Document Relationships
91-056
(Amended By)
Path:
\Resolutions\CITY COUNCIL\1952 - 1999\1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitieatian Measure <br /> <br />14. <br /> <br />Project plans and construction activities will <br />be closely coordinated with local utility <br />purveyors in order to make the necessary <br />arrangements for the relocation of facilities <br />and avoid or minimize any disruption to <br />service. It is also recommended that the <br />utilities provide adequate notice to its <br />customers of any service disruptions. <br /> <br />15. <br /> <br />Consideration will be given to the <br />undergrounding of overhead electrical and <br />telephone lines as part of the project. <br /> <br />16. <br /> <br />If feasible, construction activities and lane <br />closures will occur primarily during non-peak <br />driving periods. <br /> <br />17. <br /> <br />The City of Santa Ana's Public Works <br />Director will coordinate closely with all <br />agencies and companies which maintain <br />underground or at-grade utility or energy <br />facilities within the areas to be disturbed by <br />project construction activities. Preliminary <br />and final design plans will be made available <br />to such agencies for review and comment. At <br />least 48 hours prior to commencement of any <br />excavation activities, the City will contact the <br />Underground Service Alert to notify the <br />affected utility/energy purveyors who can <br />place their personnel at the excavation site to <br />assist in the location of underground facilities <br />during the exploratory digging immediately <br />preceding excavation. In this manner, the risk <br />of line rupture to nat~tral gas, petrulanm, and <br />sewer facilities, which might release hazardous <br />substances and odors into the air, can be <br />minimized. <br /> <br />Timin~ of Imnlementation <br /> <br />During final design and construction. <br /> <br />During final design and construction. <br /> <br />During preparation of construction and <br />traffic control plans and during <br />construction. <br /> <br />During final design and consUuction. <br /> <br />4Z <br /> <br />City Public Works Agency <br />Consulting Engineer <br />Construction Contractor <br /> <br />City Public Works Agency <br />Consulting Engineer <br />Construction Contractor <br /> <br />City PubLic Works Agency <br />Consulting Engineer <br />Construction Contractor <br /> <br />City Public Works Agency <br />Consulting Engineer <br />Consm~ction Contractor <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.